All Incidents

Search Filter:
Select type to display:
All Icon
Incident Icon
Construction Icon
Conditions Icon
Weather Icon
Special Event Icon
Activity Type Description
Construction Roadwork - on Airport Road and East 5th Street in Carson City Nevada. Shoulder closure on Airport Road and bike path closed for truck access. Monday thru Friday, 7 AM to 4 PM. Estimated End date is 02/14/20
Current as of: 1/5/2020 5:58:18 AM PST
Road Condition Chains Required, All Vehicles Except 4-Wheel Drive with Snow Tires - on CA-89 from mile post 11.1 in El Dorado County to mile post 21.0 in El Dorado County in California.
Current as of: 1/18/2020 8:38:25 AM PST
Construction Bridge Work - on CC215 Northern Beltway in both directions between Oso Blanca Rd and Sky Pointe Dr in Las Vegas, Clark County Nevada. Reduced to one lane in each direction with traffic routed to single opposing lanes as required between the hours of 9pm and 5am only and no passing allowed, beginning November 4th until June 5th, 2020 for freeway flyover ramp construction. There is a 24/7 height restriction of 15' 6" and a width restriction of 11'. Please use caution in the work zone and/or seek alternate routes.
Current as of: 10/30/2019 12:09:07 PM PDT
Construction Congestion - on Charleston Boulevard in both directions between South 3rd Street and South 6th Street in Las Vegas, Clark County Nevada. Expect possible delays due to roadway construction in Downtown Las Vegas starting March 18th, 2019 until April 2020.
Current as of: 12/3/2019 3:27:01 PM PST
Construction Roadwork - on FRCL23/Oso Blanca Rd in both directions between SR-157/Kyle Canyon Rd and just south of Elkhorn Rd in North Las Vegas, Clark County Nevada. Road will be closed 24/7 until January 23rd for utility work and paving. Use caution around this area and use other routes.
Current as of: 1/10/2020 9:42:29 PM PST
Construction Overnight Roadwork - on I-15 northbound from the Neon Gateway northbound on ramp to the US-95 northbound HOV on ramp in Las Vegas, Clark County Nevada. Lanes will be reduced on the I-15 northbound starting on January 18th from 6 p.m. until 6 a.m. January 19th. The Neon Gateway on ramp to the I-15 northbound HOV lanes will also being closed during this same time. Closures are needed for emergency attenuator repairs. Please use caution in the work zone and/or seek alternate routes.
Current as of: 1/16/2020 12:01:11 AM PST
Road Condition Oversized Load (Truck Restrictions) - on I-15 in Arizona. There will be ADOT bridgework through the Virgin River Gorge beginning May 29th and continuing through Spring 2020. All loads wider than 10 feet that are traveling between Las Vegas, Nevada and Cedar City, Utah must use the 224-mile detour route of: US-93, NV-319, UT-56. Use caution when traveling through a work zone and expect delays.
Current as of: 12/22/2019 6:00:30 PM PST
Construction Overnight Roadwork (Minor Delays) - on I-80 in both directions from Gold Ranch(Exit 2) to East McCarran Boulevard(Exit 19) in Washoe County Nevada. Beginning on 1/21/20 and ending on 1/24/20 from 9 PM to 5:30 AM, with varying lane and shoulder closures. Estimated End Time is 5:30 AM on 01/24/20
Current as of: 1/15/2020 3:46:18 AM PST
Construction Roadwork - on I-80 in both directions between Exit 360 - Moor and 2 miles east of exit 378 in Elko County Nevada. Expect speed reduction (for all vehicles) to 55 miles per hour. Decrease speed and move over for highway workers and slow moving equipment. Estimated End date is 04/03/20
Current as of: 12/23/2019 1:02:01 PM PST
Construction Roadwork - on I-80 in both directions between Exit 176 - US-95 North Winnemucca Downtown West and Exit 178 - Winnemucca Downtown East SR 289 in Humboldt County Nevada. Monday through Friday, from 6 a.m. to 5 p.m.; there will be shoulder work at each of the on and off ramps. Decrease Speed and move over for highway workers and equipment. Estimated End date is 04/08/20
Current as of: 11/12/2019 9:00:59 AM PST
Construction Utility Work - at Valmy Rest Area on I-80 exit 216, in both directions, in Humboldt County Nevada. Rest Area Closed. No parking permitted.
Current as of: 9/18/2019 1:09:41 PM PDT
Construction Utility Work - at Beowawe Rest Area on I-80 Mile Marker 257 in both directions in Eureka County Nevada. Rest Area Closed. No parking permitted.
Current as of: 9/18/2019 1:03:46 PM PDT
Road Condition Oversized Load - on I-80 East from I-80 Exit 145 - Imlay to Wells in Nevada. During the Daylight Hours on Tuesday, January 21st, in a Convoy of 3. Use Caution Around Pilot Car Escort and Slow Moving Vehicles. Estimated End Time is 7:00 PM on 01/21/20
Current as of: 1/17/2020 10:17:42 PM PST
Construction Major Delays - on Southern I-215 in both directions between the Valley View Blvd Overpass and I-15 in Las Vegas, Clark County Nevada. Delays are due to the overnight roadwork along Southern CC-215 between the Valley View Blvd Overpass and Decatur Blvd. Lanes will be reduced nightly from 8pm until 6am, January 21st through January 23rd. Use caution around this area and if possible use other routes.
Current as of: 1/18/2020 2:17:08 AM PST
Construction Roadwork - on SR-160/Blue Diamond Rd between mile marker 16 Clark County and mile marker 1 Nye County in Las Vegas, Clark County Nevada will be reduced to one travel lane in each direction, a width limit of 11', a pilot car with flaggers, no passing and no over-sized permits until late July 2020 for continued road improvements. Use caution in this area and expect up to a 30 min travel delays.
Current as of: 11/29/2019 1:13:10 PM PST
Construction Roadwork - on SR-160/Blue Diamond Road in both directions from milepost 16 to milepost 22 in Clark County Nevada. One lane open in each direction. Highway widening with occasional road closures due to blasting, details will be posted separately for days of occurrence. Pedestrians and bicyclists are prohibited. Use caution in this area; expect delays until August 2020.
Current as of: 1/9/2019 11:28:26 AM PST
Road Condition Road Closed - on SR-231 from National Forest Boundary to Angel Lake in Nevada. FOR THE SEASON.
Current as of: 12/2/2019 5:52:09 PM PST
Road Condition Oversized Load - on SR-361/Gabbs Valley Rd in Mineral County and Nye County Nevada. Over-sized Load will be moving thru the area from Hawthorne, NV to Lovelock, NV on Tuesday, January 21st during daylight hours. With a Height of 16'0", Width of 22'0", and weight of 127,200 lbs. Please use caution around slow moving vehicles with pilot car escorts.
Current as of: 1/17/2020 4:06:23 AM PST
Road Condition Chains Required, All Vehicles Except 4-Wheel Drive with Snow Tires - on SR-431 from Slide Meadows to Mount Rose Ski Resort in Nevada.
Current as of: 1/18/2020 4:13:39 AM PST
Construction Roadwork (Utility Work, Major Delays) - on SR-582/Fremont Street southbound from Charleston to Sahara in Las Vegas, Clark county Nevada. Lanes will be reduced to 1 lane from 7 a.m., September 3rd, 2019 until early 2021; due to installation of new water line, sewer line and storm drain. Use caution around work area and seek alternate routes.
Current as of: 9/3/2019 9:11:35 PM PDT
Construction Roadwork - on SR-593/Tropicana Ave in both directions between Maryland Pkwy and Boulder Hwy in Las Vegas, Clark County Nevada. Lanes will be reduced 24/7 until August 2020 for roadway improvements. Please use caution in work zone, expect possible delays and/or seek alternate routes.
Current as of: 10/16/2019 12:59:16 PM PDT
Construction Minor Delays - on SR-613/Summerlin Pky in both directions at Cimmarron Rd in Las Vegas, Clark County Nevada. Lane restrictions until early-April due to the construction of a pedestrian bridge. Use caution around this area.
Current as of: 8/9/2019 1:39:39 AM PDT
Construction Roadwork - on SR-766 from Elko County Line to Mile Post 1 in Carlin, Eureka County Nevada. Beginning on Thursday, January 23rd at 7 A. M. Decrease speed and move over for highway workers and equipment. Estimated End Time is 8:00 PM on 01/24/20
Current as of: 1/16/2020 4:53:07 PM PST
Construction New Traffic Pattern (Roadwork) - on US-50 in both directions from Roys Road to Carson Street in Lyon County Nevada. Eastbound traffic will be shifted to the new right eastbound lane, Wednesday November 13th. Westbound will remain in right westbound lane. Estimated End date is 01/31/20
Current as of: 11/27/2019 1:20:09 PM PST
Construction Roadwork (Minor Delays) - on US-50 US-95 Alternate in Silver Springs Nevada. Intersection closed, detour available. Estimated End date is 04/15/20
Current as of: 11/27/2019 1:16:11 PM PST
Road Condition Chains Required, All Vehicles Except 4-Wheel Drive with Snow Tires - on US-50 from mile post 0.0 in Douglas County to mile post 0.5 in Douglas County in Nevada.
Current as of: 1/16/2020 1:27:20 PM PST
Road Condition Chains Required, All Vehicles Except 4-Wheel Drive with Snow Tires - on US-50 from mile post 0.0 in Douglas County to mile post 7.6 in Carson City County in Nevada.
Current as of: 1/16/2020 1:27:20 PM PST
Road Condition Oversized Load - on US-6 from West of Currant - mile post NY112 to West of Murray Summit - mile post WP28 in Nevada. Please use caution.
Current as of: 1/16/2020 11:39:29 PM PST
Road Condition Oversized Load - on US-93 North from Wells to the NV/ID Border in Elko County Nevada. During the Daylight Hours on Tuesday, January 21st, in a Convoy of 3. Use Caution Around Pilot Car Escort and Slow Moving Vehicles. Estimated End Time is 7:00 PM on 01/21/20
Current as of: 1/17/2020 10:34:06 PM PST
Road Condition Oversized Load - on US-93 from US-50 Junction - mile post WP53.6 to US-93A Junction - Lages - mile post 112.8 in Nevada. Please use caution.
Current as of: 1/15/2020 4:28:36 PM PST
Construction Roadwork - on US95 in both directions between Mile Markers 20 and 22 (north of Grand Ave) in Goldfield, Esmeralda County Nevada. Lanes will be reduced 24/7 from 5 am January 6th, until 6 pm January 20th, due to paving operations. With a width limit of 14', flagging operations and no passing. Speed limit reduced to 40 mph. Use caution around work area.
Current as of: 1/16/2020 10:53:15 AM PST
Construction Roadwork (Truck Restrictions) - on US-95 in both directions between Hawthorne and Schurz in Mineral County Nevada. Over-size load restrictions, 12 foot lanes. 24 hours a day. Estimated End date is 07/01/20
Current as of: 1/17/2020 6:24:19 AM PST
Construction Overnight Roadwork - on US-95 in both directions between Ann Rd and Buffalo Rd in North Las Vegas, Clark County Nevada. Reduced lanes and periodical detours from 8pm until 5am, Sunday evening through Friday morning beginning April 8th until early 2020 for continued Centennial Bowl construction. Use caution around these areas and if possible use other routes.
Current as of: 12/7/2019 5:55:22 AM PST
Construction Roadwork - on US-95 northbound off ramp to westbound Northern I-215 in North Las Vegas, Clark County Nevada. Ramp will be permanently closed on February 5th at 5am for construction of a new fly over ramp. Use alternate route and caution around this area.
Current as of: 1/31/2019 10:30:47 PM PST
This page auto-refreshes every 2 minutes.