All Incidents

Search Filter:
Select type to display:
All Icon
Incident Icon
Construction Icon
Conditions Icon
Weather Icon
Special Event Icon
Activity Type Description
Construction Bridge Work - on CC215 Northern Beltway in both directions between Oso Blanca Rd and Sky Pointe Dr in Las Vegas, Clark County Nevada. Reduced to one lane in each direction with traffic routed to single opposing lanes as required between the hours of 9pm and 5am only and no passing allowed, through Late 2020 for freeway flyover ramp construction. There is a 24/7 height restriction of 15' 6" and a width restriction of 11'. Please use caution in the work zone and/or seek alternate routes.
Current as of: 6/6/2020 3:28:53 AM PDT
Construction Overnight Roadwork - on FRCL23/Oso Blanca Rd on ramp to southbound US-95 in North Las Vegas, Clark County Nevada. On ramp will be closed 24/7 beginning 8pm, September 13th until early October for continued Centennial Bowl construction. Use other routes and caution around this area.
Current as of: 9/9/2020 11:05:41 PM PDT
Construction Roadwork - on FRCL61/Sloan Rd between Arville St and Las Vegas Blvd under I-15 in Sloan, Clark County Nevada. 24/7 restrictions begin June 21st until September 25th for road improvements. Reduced lanes with posted detours. If possible use other routes and use caution around this area.
Current as of: 6/19/2020 9:00:47 PM PDT
Construction Roadwork - on Front Street between Humboldt Street and Reese Street in Battle Mountain Nevada. Beginning September 25th at 8 a.m. Lanes reduced to one. Please use caution and slow down for workers and equipment. Estimated End Time is 2:00 PM on 09/25/20
Current as of: 9/22/2020 11:17:18 AM PDT
Construction Roadwork - on I-11 in both directions between US-95 and Arizona state line in Boulder City, Clark County Nevada. Lanes will be reduced from 8 am until 4 pm September 23rd and September 24th for bridge inspections. Use caution in the area.
Current as of: 9/19/2020 12:43:43 PM PDT
Construction Overnight Roadwork - on I-15 northbound at SR-146/St. Rose Pkwy in Las Vegas, Clark County Nevada. Off ramp left shoulder will be closed from 9pm September 24th until 5:30 am September 25th for exploratory drilling. There is a width restriction of 20ft. Use caution in the area.
Current as of: 9/22/2020 6:39:32 PM PDT
Construction Roadwork - on I-15 northbound and southbound at Falcon Ridge Pkwy in Mesquite, Clark County Nevada. Lanes will be reduced to single travel lane 24/7 in both directions from 12:01 am September 9th thru 3 pm October 6th for continued roadway improvements. Use caution in the area and expect minor delays.
Current as of: 8/26/2020 5:38:03 PM PDT
Construction Roadwork - on I-15 in both directions between West Mesquite Blvd/Falcon Ridge Pkwy and the Nevada/Arizona State-line in Mesquite, Clark County Nevada. Reduced to one lane daily from 6am to 3pm - Monday thru Friday. Work will occur in 2 mile increments with 12' Wide restrictions until October 15th for paving improvements. Use caution, expect delays or consider other routes if possible.
Current as of: 7/20/2020 6:27:00 PM PDT
Construction Overnight Roadwork (Minor Delays) - on I-580 North from Neil Road to I-80 in Reno Nevada. Single lane traffic northbound nightly from 11 PM to 5:30 AM. Estimated End Time is 5:30 AM on 09/25/20
Current as of: 9/15/2020 3:35:15 PM PDT
Construction Roadwork - on I-580 North from Neil Road to I-80 in Reno, Washoe County Nevada. Beginning on 8/21/20 to 9/30/20 roadwork will begin at 6 AM and will continue for 24 hours a day with lane closures and a speed reduction to 55 MPH in place. There will be a lane split beginning just north of Villanova Drive to the I-80 overpass, the middle lanes will be closed and the two left lanes to US-395 will be provided on the left side of the split and two right lanes will be provided for local access and access to I-80 Eastbound and Westbound ramps. Consider an alternate route if possible. Estimated End date is 09/30/20
Current as of: 8/27/2020 8:42:12 PM PDT
Construction Roadwork - on I-580 North from Exit 30 Neil Road to Exit 36 I-580/I-80 in Washoe County Nevada. Lanes will be reduced and speed reduced to 55 miles per hour. This will be done nightly. Estimated End date is 10/22/20
Current as of: 8/20/2020 9:55:31 PM PDT
Construction Roadwork - on I-80 in both directions from the Halleck Interchange to the Elburz interchange in Elko County Nevada. Decrease speed and move over for highway workers and equipment. Estimated End Time is 3:30 PM
Current as of: 9/24/2020 6:38:51 AM PDT
Construction Moving Roadwork - on I-80 in both directions from milemarker 172 to milemarker 179 in Winnemucca, Humboldt County Nevada. Mowing weeds on the shoulder. Please use caution, slow down and move over for highway workers and equipment. Estimated End Time is 4:30 PM on 09/24/20
Current as of: 9/22/2020 12:01:56 PM PDT
Construction Roadwork - on I-80 in both directions between Exit 360 - Moor and 2 miles east of Exit 378 in Elko County Nevada. Expect delay with single lane in each direction, a 14 foot width limit, and speed limit reduced to 55 miles per hour. Stay alert and move over for highway workers and equipment. Estimated End Time is 4:30 PM on 09/30/20
Current as of: 9/17/2020 7:59:48 AM PDT
Construction Utility Work - on I-80 West from Milemarker 270 to Milemarker 277 in Eureka County Nevada. Motorists can expect the right lane to be closed between 6 a.m. and 5 p.m. Mondays through Fridays. Decrease speed and move over for workers on the shoulder. Estimated End Time is 5:00 PM on 10/05/20
Current as of: 9/9/2020 7:42:57 AM PDT
Construction Utility Work - on I-80 in both directions at Beowawe Rest Area in Eureka County Nevada. Rest Area Closed indefinitely. No parking permitted.
Current as of: 8/31/2020 7:35:43 AM PDT
Construction Roadwork (Minor Delays) - on I-80 West near Farad in Nevada County California. Intermittent traffic holding from 7 AM to 4 PM, Monday through Friday. Estimated End date is 09/30/20
Current as of: 8/21/2020 2:56:22 PM PDT
Construction Utility Work - on I-80 in both directions at Valmy Rest Area in Humboldt County Nevada. Rest Area Closed indefinitely. No parking permitted.
Current as of: 5/13/2020 10:48:48 AM PDT
Road Condition Oversized Load - on I-80 from Central Carlin - Exit 280 to I-80 Exit 233 - SR 304 East Battle Mountain in Nevada. During the Daylight Hours on Thursday, September 24th. Use Caution Around Pilot Car Escort and Slow Moving Vehicles. Estimated End Time is 7:00 PM on 09/24/20 Estimated End Time is 7:00 PM on 09/24/20
Current as of: 9/23/2020 12:24:55 AM PDT
Construction Utility Work - on Mill Street West between Greg Street and Kietzke Lane in Reno, Washoe County Nevada. Beginning on 9/8/20 to 9/25/20 from 6 AM to 6 PM single lane traffic with lane closures and speed reduction to 35 MPH. Consider an alternate route. Estimated End Time is 6:00 PM on 09/25/20
Current as of: 9/6/2020 6:29:51 PM PDT
Construction Roadwork (New Traffic Pattern) - on Robb Drive at I-80 in Reno Nevada. Various lane closures with flaggers from 10 AM to 7 PM, Monday through Friday. Estimated End date is 06/22/21
Current as of: 6/22/2020 3:16:23 PM PDT
Construction Roadwork - on SR-140 in both directions from milepost 70 to milepost 74 in Humboldt County Nevada. Weekdays only, beginning September 23rd. Expect the use of pilot cars and flaggers, with routing to opposing lanes and no passing. Estimated End Time is 4:00 PM on 10/01/20
Current as of: 9/23/2020 8:25:04 AM PDT
Construction Roadwork - on SR-146/St. Rose Pkwy/Pecos Rd in both directions at Southern I-215 in Las Vegas, Clark County Nevada. A 24/7 height restriction of 14'6" will begin on July 1st through November 30th for erecting false-work and crash beam construction. Use caution around this area.
Current as of: 7/3/2020 10:04:53 PM PDT
Construction Roadwork - on SR-160/Blue Diamond Road in both directions from mile post 16 to 30 in Clark County Nevada. Lanes will be reduced 24/7, from July 30th until October 31st. With Flaggers, no passing and pilot car escort. 11' width limit and a reduced speed limit. Expect delays due to roadway expansion. Use caution in this area.
Current as of: 8/4/2020 7:38:05 PM PDT
Construction Roadwork - on SR-227 South from 12th Street to Sunrise Drive in Elko County Nevada. Right lane closed at Sunrise Drive from September 23rd through September 26th. Traffic control to be set up on Wednesday, September 23rd and Saturday, September 26th from 9:00 AM to 4:30 PM. Detour is available to access Sunrise Drive. Use caution and slow down for workers and vehicles. Estimated End Time is 4:30 PM on 09/26/20
Current as of: 9/22/2020 5:54:09 AM PDT
Construction Utility Work - on SR-227 South from 12th Street to Elko Vista in Elko County Nevada. Monday through Friday, from 7 a.m. to 5 p.m.; motorists can expect shoulder work. Decrease speed and move over for construction workers and equipment. Estimated End date is 10/31/20
Current as of: 8/13/2020 1:26:35 PM PDT
Construction Moving Roadwork - on SR-228 in both directions from Jiggs to SR-227 in Elko County Nevada. Mondays through Fridays, between 7 a.m. to 4: 30 p.m.; expect flaggers, pilot car, no passing, and 14 foot width limit. Slow down and move over for highway workers and equipment. Estimated End Time is 4:30 PM on 09/28/20
Current as of: 9/8/2020 5:06:15 PM PDT
Construction Roadwork - on SR-28 in both directions at Country Club Drive in Washoe County Nevada. Traffic control. Estimated End Time is 5:30 AM on 09/25/20
Current as of: 9/24/2020 2:03:52 AM PDT
Construction Roadwork - on SR-28 in both directions from US-50 to Stateline Road in Douglas County Nevada. Shoulder and lane closure with traffic control. Estimated End Time is 3:30 PM on 09/25/20
Current as of: 9/14/2020 11:10:06 PM PDT
Construction Moving Roadwork - on SR-290 in both directions from the US-95 Junction to Paradise Valley in Humboldt County Nevada. Painting solid and stripe lines in a moving operation. Please use caution, slow down and move over for highway workers and equipment. Estimated End Time is 4:30 PM on 09/24/20
Current as of: 9/23/2020 8:49:23 AM PDT
Construction Roadwork - on SR-294 in both directions from Mile Post 0 to Hanson St. in Humboldt County Nevada. Beginning at 6 AM on Monday, August 24th, Motorists Can Expect A Width Limit of 14 feet, Lanes Reduced to 1 With a Travel Delay Up To 30 Minutes. Flaggers and Pilot Car Escort Will Be In Place With Traffic Being Routed to Opposing Lanes. Use Caution. Slow Down and Move Over for Highway Personnel and Equipment. Estimated End date is 10/02/20
Current as of: 8/21/2020 6:38:11 AM PDT
Construction Roadwork - on SR-305 in both directions from 20th Street to SR 304 in Battle Mountain, Lander County Nevada. Mondays through Fridays, 6 a.m. to 7 p.m.; motorists can expect flaggers and pilot car for single lane traffic, a 14 foot width Limit and, travel delay up to 30 minutes. Estimated End Time is 7:00 PM on 10/02/20
Current as of: 9/15/2020 3:52:17 PM PDT
Road Condition Oversized Load - on SR-306 from I-80 Mile Marker 231 to SR-306 Cortez Mine in Nevada. During the Daylight Hours on Thursday, September 24th. Use Caution Around Pilot Car Escort and Slow Moving Vehicles. Estimated End Time is 7:00 PM on 09/24/20 Estimated End Time is 7:00 PM on 09/24/20
Current as of: 9/23/2020 12:24:17 AM PDT
Construction Roadwork - on SR-341 North from Equestrian road to Veterans parkway in Washoe County Nevada. Right lane closed. Estimated End date is 09/30/20
Current as of: 8/10/2020 9:54:48 PM PDT
Construction Roadwork (Minor Delays) - on SR-359 between Milepost 9 and 14 in Mineral County Nevada. Intermittent closures, up to 30 minute delays, Monday thru Friday 7 AM to 9 AM. Estimated End date is 12/30/20
Current as of: 9/14/2020 8:58:41 AM PDT
Road Condition Oversized Load - on SR-361/Gabbs Valley Rd, US-95, Durango Dr, I-215, I-11, US-93 in Mineral County, Esmeralda County, Nye County and Clark County Nevada. The Oversized-Load will be moving thru the area from California/Nevada State Line to the Nevada/Arizona State line, Friday September 25th during daylight hours only. With a Length 94'0", Height 15'0", Width 18'7", and Weight Legal. Please use caution around slow moving vehicles with pilot car escort.
Current as of: 9/22/2020 4:25:47 AM PDT
Construction Roadwork - on SR-439 USA Parkway South from Clark Station Road to mile marker 6 in Storey County Nevada. Right lane and shoulder closed. Estimated End date is 09/30/20
Current as of: 8/22/2020 5:10:11 AM PDT
Road Condition Road Closed - on SR-445 in both directions and SR-446 in Washoe County Nevada. Starting 2 PM on 5/8/2020, SR-445 and SR-446 at Pyramid Lake will be closed to all non-members and non-residents.
Current as of: 5/7/2020 4:02:19 PM PDT
Construction Roadwork - on SR-582/Boulder Hwy in both directions between Sahara Ave and Charleston Blvd in Las Vegas, Clark County Nevada. Left lanes will be reduced from 6am to 4:30pm February 5th until September 30th for utility work. Use caution in work zone and/or seek alternate routes.
Current as of: 9/5/2020 2:17:29 AM PDT
Construction Major Delays (Roadwork, Utility Work) - on SR-582/Fremont Street southbound from Charleston to Sahara in Las Vegas, Clark county Nevada. Lanes will be reduced to 1 lane from 7 a.m., September 3rd, 2019 until early 2021; due to installation of new water line, sewer line and storm drain. Use caution around work area and seek alternate routes.
Current as of: 7/23/2020 11:17:09 AM PDT
Construction Roadwork - on SR-593/Tropicana Ave in both directions between Maryland Pkwy and Boulder Hwy in Las Vegas, Clark County Nevada. Lanes will be reduced daily until Mid October 2020. Use caution and expect delays.
Current as of: 9/24/2020 11:11:24 AM PDT
Construction Roadwork - on SR-596/Jones Blvd in both directions between Smoke Ranch Rd and Upland Blvd in Las Vegas, Clark County Nevada. Lane restrictions from 6am until 3:30pm, Monday thru Friday, July 6th until January 2021 for road improvements and upgrades. Use caution around this area and expect delays.
Current as of: 7/3/2020 1:07:19 AM PDT
Construction Roadwork - on SR-647 in both directions at East fourth street and Galletti Way in Washoe County Nevada. Lane closure and lane shift. Estimated End date is 09/30/20
Current as of: 8/29/2020 6:20:56 AM PDT
Construction Overnight Roadwork (Minor Delays) - on SR-659 McCarran Boulevard in both directions from South Virginia to West 4th Street in Reno Nevada. Single lane traffic nightly, Sunday thru Thursday 7 PM to 6 AM. Estimated End date is 11/20/20
Current as of: 6/19/2020 9:02:40 AM PDT
Road Condition Oversized Load - on SR-766 from mile post 6.3 to Carlin in Eureka County in Nevada. During the Daylight Hours on Thursday, September 24th. Use Caution Around Pilot Car Escort and Slow Moving Vehicles. Estimated End Time is 7:00 PM on 09/24/20
Current as of: 9/23/2020 12:25:27 AM PDT
Construction Roadwork - on Stead Boulevard southbound between North Virginia Street and Silver Lake Road in Washoe County Nevada. Beginning on 09/15/20 to 10/01/20 from 8 AM to 3:30 PM during weekdays only. Right lane closed for maintenance. Estimated End Time is 3:30 PM on 10/01/20
Current as of: 9/16/2020 3:53:34 PM PDT
Construction Roadwork (Minor Delays) - on US-395 in both directions from North McCarran Boulevard to Lemmon Drive in Reno Nevada. Various lane and ramp closures seven days a week. Estimated End date is 10/31/20
Current as of: 9/10/2020 3:13:24 PM PDT
Construction Roadwork (Minor Delays) - on US-395 in both directions at Parr Dandini Exit 71 in Reno Nevada. On and off ramps closed until further notice. No access to Parr or Dandini from US-395.
Current as of: 8/28/2020 10:10:13 AM PDT
Construction Overnight Roadwork (Minor Delays) - on US-395 in both directions between North McCarran Boulevard and North Virginia Street in Reno Nevada. Intermittent lane and shoulder closures with reduced speed limit, 8 PM to 5 AM. Estimated End date is 11/27/20
Current as of: 8/5/2020 5:06:59 PM PDT
Road Condition Oversized Load (Minor Delays) - on US-395 South to I-80 east Exit 48, US-95 Alternate south thru Fernley round-about. East on US-50 Alternate, US-50 thru Fallon, to south on SR-361 at Middlegate in Nevada. Pilot vehicle with N H P escorts, Friday daylight travel only. Estimated End Time is 7:00 PM on 09/25/20
Current as of: 9/23/2020 11:42:53 AM PDT
Construction Roadwork (Minor Delays) - on US-50 westbound from the Carson Douglas county line to Mile post 13 in Douglas County Nevada. Right lane closed, maintenance. Estimated End Time is 3:30 PM
Current as of: 9/24/2020 7:37:41 AM PDT
Construction Roadwork - on US-50 in both directions from Forest Road to Mile Post 25 in Austin, Lander County Nevada. Mondays through Fridays, expect single lane traffic with flaggers, pilot cars, width limit of 12 feet, various lane restrictions, and 30 minute delays. Decrease speed and move over for construction workers and equipment. Estimated End date is 10/23/20
Current as of: 9/19/2020 11:19:56 AM PDT
Construction Roadwork (Minor Delays) - on US-50A from Lyon mile post 11 to Main Street in Fernley Nevada. Single lane traffic with flaggers and pilot vehicle. Monday thru Friday 6 AM to 6 PM. Estimated End Time is 6:00 PM on 10/02/20
Current as of: 9/9/2020 8:29:48 AM PDT
Construction Roadwork (Minor Delays) - on US6 and SR-360 in both directions in near Tonopah, Esmeralda County and Mineral County Nevada. From 5 a.m. August 24th until 10 p.m. October 24th Monday through Saturday. Lanes will be reduced to one lane in each direction with width of 13',reduced speeds to 45/35 mph, flagger and pilot escorts, no passing zone and no oversize vehicles. Use caution around work zone and/or seek alternate routes. Closures due to paving upgrades.
Current as of: 8/21/2020 12:54:15 PM PDT
Incident 24-Sep-2020 11:20 am, Disabled-vehicle on US-95 NB at Casino Center, Right lane blocked. Use caution in the area.
Current as of: 9/24/2020 11:21:07 AM PDT
Construction Minor Delays (Roadwork) - on US-95 between Milepost 64 and 65 in Walker Lake Nevada. Single lane traffic with flaggers and pilot vehicle, Monday thru Wednesday 6 AM to 6:30 PM. 12 foot lane restrictions. Estimated End Time is 6:30 PM on 09/24/20
Current as of: 9/21/2020 5:59:43 AM PDT
Construction Roadwork - on US-95 northbound between MM 72 and MM 104 in Beatty, Nye County Nevada. Daily 6 am to 4 pm, September 15th thru April 2021 for continued improvements. there will be flaggers and pilot car escorts. Expect delays and use caution in the area.
Current as of: 9/17/2020 11:48:07 AM PDT
Construction Roadwork - on US-95 in both directions from California State Line to SR-163/Laughlin Hwy in Laughlin, Clark County Nevada. Reduced to 1 lane for paving with flaggers and pilot car escorts from 2 am to 2 pm September 14th thru December 31st. Expect 30 minute delays. Use caution in the area and or seek other routes.
Current as of: 9/10/2020 12:04:33 PM PDT
Construction Roadwork - on US-95 in both directions from the north end of Hawthorne to US-95 Alternate at Schurz in Mineral County Nevada. Lanes reduced to 12 feet wide, 24 hours a day. Estimated End date is 10/02/20
Current as of: 6/23/2020 9:29:10 AM PDT
Construction Roadwork (Minor Delays) - on US-95A in both directions approximately mile post 35 in Weeks, Lyon County Nevada. Single lane traffic with flaggers, railroad crossing repair.
Current as of: 5/13/2020 9:06:52 AM PDT
This page auto-refreshes every 2 minutes.