Construction Bridge Work - on CC215 Northern Beltway in both directions between Oso Blanca Rd and Sky Pointe Dr in Las Vegas, Clark County Nevada. Reduced to one lane in each direction with traffic routed to single opposing lanes as required between the hours of 9pm and 5am only and no passing allowed, through Late 2020 for freeway flyover ramp construction. There is a 24/7 height restriction of 15' 6" and a width restriction of 11'. Please use caution in the work zone and/or seek alternate routes.
Current as of: 6/6/2020 3:28:53 AM PDT
Construction Overnight Roadwork - on I-15 northbound to Martin Luther King Blvd in Las Vegas, Clark County Nevada. From 10pm October 22nd until 4am October 23rd, Off ramp will be closed for fiber optic cable testing/repairs. Use caution in the work zone and/or seek alternate routes.
Current as of: 10/19/2020 7:19:01 AM PDT
Construction Overnight Roadwork - on I-15 northbound at Sahara Ave in Las Vegas, Clark County Nevada. From 10pm October 22nd until 4am October 23rd, right shoulder and right lane will be closed for fiber optic cable testing/repairs. Use caution in the work zone and/or seek alternate routes.
Current as of: 10/19/2020 7:06:03 AM PDT
Construction Overnight Roadwork - on I-15 northbound offramp to SR-160/Blue Diamond Road in Las Vegas, Clark County Nevada. Nightly from 9 p.m. October 21st until 5:30 a.m. October 23rd. Ramp will be closed for exploratory boring. Use caution in the area and/or seek alternate routes
Current as of: 10/17/2020 6:04:12 AM PDT
Construction Roadwork - on I-15 in both directions between SR-574/Cheyenne Ave and SR-573/Craig Rd in North Las Vegas, Clark County Nevada. Right lanes will be reduced 24/7 starting October 5th until Mid-December 2020 for bridge repairs. Use caution in the work zone and expect delays.
Current as of: 10/19/2020 5:57:49 AM PDT
Construction Roadwork - on I-15 in both directions at Northern CC-215 in North Las Vegas, Clark County Nevada. Lanes and shoulders will be reduced daily until Late 2021 for road improvements. Use caution around this area.
Current as of: 10/11/2020 3:02:13 AM PDT
Construction Roadwork - on I-15 northbound at SR-610/Lamb Blvd in North Las Vegas, Clark County Nevada. Lanes will be reduced 24/7 from 12 PM October 9th 2020 until October 9th 2021 for falsework of bridge construction. There will be width limits of 12 ft and height limits of 16 ft. Detours will be in place. Use caution in the area and/or use other routes.
Current as of: 10/9/2020 11:46:43 AM PDT
Construction Roadwork - on I-15 in both directions between West Mesquite Blvd/Falcon Ridge Pkwy and the Nevada/Arizona State-line in Mesquite, Clark County Nevada. Reduced to one lane daily from 6am to 3pm - Monday thru Friday. Work will occur in 2 mile increments with 14' Wide restrictions until October 30th for paving improvements. Use caution, expect delays or consider other routes if possible.
Current as of: 10/6/2020 8:38:31 AM PDT
Construction Overnight Roadwork (Minor Delays) - on I-580 North from Plumb Lane to I-80 in Reno Nevada. Left lanes closed. Estimated End Time is 6:00 AM on 11/11/20
Current as of: 10/14/2020 12:28:45 PM PDT
Construction Roadwork - on I-580 North from Exit 30 Neil Road to Exit 36 I-580/I-80 in Washoe County Nevada. Lanes will be reduced and speed reduced to 55 miles per hour. This will be done nightly. Estimated End date is 10/22/20
Current as of: 8/20/2020 9:55:31 PM PDT
Construction Overnight Roadwork (Minor Delays) - on I-80 East near Exit 21 - Vista Boulevard in Sparks Nevada. Left lane closed from 8 pm to 5 AM. Estimated End Time is 5:00 AM
Current as of: 10/19/2020 1:20:35 PM PDT
Construction Roadwork - on I-80 in both directions between Exit 360 - Moor and 2 miles east of Exit 378 in Elko County Nevada. Expect delay with single lane in each direction, a 14 foot width limit, and speed limit reduced to 55 miles per hour. Stay alert and move over for highway workers and equipment. Estimated End Time is 5:00 PM on 10/22/20
Current as of: 10/16/2020 2:01:48 PM PDT
Construction Utility Work - on I-80 West from Milemarker 270 to Milemarker 277 in Eureka County Nevada. Mondays through Fridays, 6 a.m. and 5 p.m.; Motorists can expect the right lane to be closed, with a lane restriction of 14 feet. Decrease speed and move over for workers. Estimated End Time is 5:00 PM on 11/05/20
Current as of: 10/16/2020 2:30:09 PM PDT
Construction Utility Work - on I-80 in both directions at Beowawe Rest Area in Eureka County Nevada. Rest Area Closed indefinitely. No parking permitted.
Current as of: 8/31/2020 7:35:43 AM PDT
Construction Utility Work - on I-80 in both directions at Valmy Rest Area in Humboldt County Nevada. Rest Area Closed indefinitely. No parking permitted.
Current as of: 5/13/2020 10:48:48 AM PDT
Construction Roadwork (Minor Delays) - on Mill Street westbound between Terminal Way and Golden Lane in Reno Nevada. Westbound traffic will be diverted in to the median, Monday thru Friday 7 AM to 4 PM daily. Estimated End Time is 9:09 PM on 11/14/20
Current as of: 10/17/2020 8:16:02 PM PDT
Construction Roadwork (New Traffic Pattern) - on Robb Drive at I-80 in Reno Nevada. Various lane closures with flaggers from 10 AM to 7 PM, Monday through Friday. Estimated End date is 06/22/21
Current as of: 6/22/2020 3:16:23 PM PDT
Construction Roadwork - on SR-146/St. Rose Pkwy/Pecos Rd in both directions at Southern I-215 in Las Vegas, Clark County Nevada. A 24/7 height restriction of 14'6" will begin on July 1st through November 30th for erecting false-work and crash beam construction. Use caution around this area.
Current as of: 7/3/2020 10:04:53 PM PDT
Construction Roadwork - on SR-159/Charleston Blvd in both directions at Lamb Blvd in Las Vegas, Clark County Nevada. Daily lane and shoulder restrictions until Mid November 2020 for intersection improvements. Use caution around this area and expect delays.
Current as of: 10/11/2020 3:08:50 AM PDT
Construction Roadwork - on SR-160/Blue Diamond Rd in both directions at Postal Dr in Pahrump, Nye County Nevada. Daily lane restrictions until Late December 2020 for road improvements. Use caution around this area.
Current as of: 10/11/2020 3:06:46 AM PDT
Construction Roadwork - on SR-160/Blue Diamond Road in both directions from mile post 16 to 30 in Clark County Nevada. Lanes will be reduced 24/7, from July 30th until October 31st. With Flaggers, no passing and pilot car escort. 11' width limit and a reduced speed limit. Expect delays due to roadway expansion. Use caution in this area.
Current as of: 8/4/2020 7:38:05 PM PDT
Construction Utility Work - on SR-227 South from 12th Street to Elko Vista in Elko County Nevada. Monday through Friday, from 7 a.m. to 5 p.m.; motorists can expect shoulder work. Decrease speed and move over for construction workers and equipment. Estimated End date is 10/31/20
Current as of: 8/13/2020 1:26:35 PM PDT
Construction Roadwork - on SR-28 northbound south of Sand Harbor in Washoe County Nevada. Shoulder closed, Monday 9 AM to 12 PM. Estimated End Time is 12:00 PM on 10/20/20
Current as of: 10/17/2020 6:59:22 PM PDT
Construction Utility Work - on SR-294 West at Mile Post 6 in Winnemucca, Humboldt County Nevada. Use Caution. Expect Delays. Decrease Speed and Move Over For Utility Workers and Personnel. Estimated End Time is 1:00 PM on 10/20/20
Current as of: 10/14/2020 3:29:40 PM PDT
Construction Roadwork - on SR-341 from mile marker 1 to mile marker 3 in Washoe County Nevada. Single lane traffic with flaggers, Monday thru Friday 6:30 AM to 4 PM daily. Estimated End Time is 4:00 PM on 11/05/20
Current as of: 10/17/2020 6:54:49 PM PDT
Construction Roadwork (Minor Delays) - on SR-359 between Milepost 9 and 14 in Mineral County Nevada. Intermittent closures, up to 30 minute delays, Monday thru Friday 7 AM to 9 AM. Estimated End date is 12/30/20
Current as of: 9/14/2020 8:58:41 AM PDT
Construction Major Delays (Roadwork, Utility Work) - on SR-582/Fremont Street southbound from Charleston to Sahara in Las Vegas, Clark county Nevada. Lanes will be reduced to 1 lane from 7 a.m., September 3rd, 2019 until early 2021; due to installation of new water line, sewer line and storm drain. Use caution around work area and seek alternate routes.
Current as of: 7/23/2020 11:17:09 AM PDT
Construction Roadwork - on SR-596/Jones Blvd in both directions between Smoke Ranch Rd and Upland Blvd in Las Vegas, Clark County Nevada. Lane restrictions from 6am until 3:30pm, Monday thru Friday, July 6th until January 2021 for road improvements and upgrades. Use caution around this area and expect delays.
Current as of: 7/3/2020 1:07:19 AM PDT
Construction Overnight Roadwork (Minor Delays) - on SR-659 McCarran Boulevard in both directions from South Virginia to West 4th Street in Reno Nevada. Single lane traffic nightly, Sunday thru Thursday 7 PM to 6 AM. Estimated End date is 11/20/20
Current as of: 6/19/2020 9:02:40 AM PDT
Construction Roadwork - on SR-789 in both directions at Mile Post 6 in Humboldt County Nevada. Use Caution. Traffic Routed to Opposing Lanes. No Oversize Permits and Overweight Permits. Decrease Speed and Move Over For Flaggers and Highway Personnel and Equipment. Estimated End Time is 4:00 PM on 10/21/20
Current as of: 10/14/2020 7:53:07 AM PDT
Construction Overnight Roadwork (Minor Delays) - on US-395 in both directions between North McCarran Boulevard and North Virginia Street in Reno Nevada. Intermittent lane and shoulder closures with reduced speed limit, 7 PM to 5 AM southbound and 7 PM and 1 PM northbound. Estimated End date is 11/27/20
Current as of: 10/9/2020 10:56:22 AM PDT
Construction Roadwork (Minor Delays) - on US-395 in both directions from North McCarran Boulevard to Lemmon Drive in Reno Nevada. Various lane and ramp closures seven days a week. Estimated End date is 10/31/20
Current as of: 9/10/2020 3:13:24 PM PDT
Construction Roadwork (Minor Delays) - on US-50 eastbound from Trento Lane to Lucas Road in Churchill County Nevada. Right lane closed daily 7 AM to 3:30 PM, Wednesday through Tuesday. Estimated End Time is 3:30 PM on 10/20/20
Current as of: 10/17/2020 7:11:37 PM PDT
Construction Roadwork - on US-50 westbound at Cave Rock Tunnel in Douglas County Nevada. Right lane closed, Monday 1 PM to 4 PM. Estimated End Time is 4:00 PM on 10/20/20
Current as of: 10/17/2020 6:57:17 PM PDT
Construction Roadwork - on US-50 in both directions from Forest Road to Mile Post 25 in Austin, Lander County Nevada. Mondays through Fridays, expect single lane traffic with flaggers, pilot cars, width limit of 14 feet, various lane restrictions, and 30 minute delays. Decrease speed and move over for construction workers and equipment. Estimated End Time is 5:30 PM on 10/23/20
Current as of: 10/17/2020 12:41:18 PM PDT
Construction Roadwork (Minor Delays) - on US-50 in both directions from California State Line to SR-28 in Douglas County Nevada. Various lane closures from 7 AM to 3:30 PM, Monday through Friday. Estimated End date is 12/30/20
Current as of: 9/30/2020 1:51:38 PM PDT
Construction Utility Work - on US-50 in both directions from Aultman Street to US-6 in Ely, White Pine County Nevada. 6 a.m. to 6 p.m., Mondays through Fridays; lanes will be reduced to one in each direction, with no passing and 14 feet width limit. Decrease speed and use caution for highway workers and equipment. Estimated End Time is 6:00 PM on 10/28/20
Current as of: 10/9/2020 11:23:45 AM PDT
Construction Roadwork - on US-50A in both directions south of Coyote lane to Main street in Lyon County Nevada. Single lane traffic with traffic control monday through friday 6 AM to 6 PM. Estimated End Time is 6:00 PM on 10/28/20
Current as of: 10/12/2020 12:13:02 PM PDT
Construction Roadwork (Minor Delays) - on US6 and SR-360 in both directions in near Tonopah, Esmeralda County and Mineral County Nevada. From 5 a.m. August 24th until 10 p.m. October 24th Monday through Saturday. Lanes will be reduced to one lane in each direction with width of 13',reduced speeds to 45/35 mph, flagger and pilot escorts, no passing zone and no oversize vehicles. Use caution around work zone and/or seek alternate routes. Closures due to paving upgrades.
Current as of: 8/21/2020 12:54:15 PM PDT
Construction Roadwork - on US-95 in both directions between MM 72 and MM 106 in Beatty, Nye County Nevada. Lanes will be routed to opposing sides 24/7 from 6 am October 14th 2020 until 6 pm March 5th 2021 for paving. There will be flaggers and pilot cars and speed will be reduced to 55 MPH. Expect delays. Use caution in the area and/or other routes.
Current as of: 10/9/2020 12:24:52 PM PDT
Construction Roadwork - on US-95 northbound between MM 72 and MM 104 in Beatty, Nye County Nevada. Daily 6 am to 4 pm, September 15th thru April 2021 for continued improvements. there will be flaggers and pilot car escorts. Expect delays and use caution in the area.
Current as of: 10/9/2020 12:24:08 PM PDT
Construction Roadwork - on US-95 in both directions from California State Line to SR-163/Laughlin Hwy in Laughlin, Clark County Nevada. Reduced to 1 lane for paving with flaggers and pilot car escorts from 2 am to 2 pm September 14th thru December 31st. Expect 30 minute delays. Use caution in the area and or seek other routes.
Current as of: 9/10/2020 12:04:33 PM PDT
Construction Roadwork (Minor Delays) - on US-95A in both directions approximately mile post 35 in Weeks, Lyon County Nevada. Single lane traffic with flaggers, railroad crossing repair.
Current as of: 5/13/2020 9:06:52 AM PDT